The experienceyou want

The approachyou need.

Ganister Station - Adult Day Care Renovations

LOCATION: Mineral Point, PA

PROJECT COST: $60,000

PROJECT DESCRIPTION
The project was for the alterations and change in use of a one story, 2,500 SF wood framed/brick veneered building. The building, formally a church, will now be used as an adult day care facility for persons with intellectual disabilities. The renovations included the complete demolition and rebuild of the existing restrooms in order to comply with ADA requirements. An existing stage was removed and a new floor system framed to accommodate two new offices at the west end of the building. Mechanical system upgrades included new water supply and sanitary lines, and new supply duct runs and exhaust fans in the new restrooms. Finally, a new fire alarm system with 24/7 monitoring services was installed throughout the facility.

SPECIALIZED EQUIPMENT AND SERVICES
Stiffler McGraw's services included the architectural, structural, HVAC, plumbing and electrical design for the project.

Scroll To Top